Total contracted capacity

Total contracted firm withdrawal and injection capacity (data in the table are only indicative and depend on actual storage level)

Enter the date range
Total contracted capacity from 09.05.2012 till 19.05.2012
Date Total contracted firm injection capacity [GWh/day] Total contracted firm withdrawal capacity [GWh/day]
09.05.2012 269,4 338,1
10.05.2012 269,4 338,1
11.05.2012 269,1 338,1
12.05.2012 309,3 400,7
13.05.2012 308,6 400,7
14.05.2012 308,6 400,7
15.05.2012 308,6 400,7
16.05.2012 308,6 400,7
17.05.2012 308,6 400,7
18.05.2012 307,5 401,2
19.05.2012 307,5 401,2