Shutdowns and maintenance

Period Restriction Comment
01.06.2012 - 20.06.2012 to 80% of maximal available injection capacity and 81% of maximal available withdrawal capacity reconstruction on UGS Tvrdonice
10.10.2012 - 31.10.2012 to 69% of maximal available injection capacity and 56% of maximal available withdrawal capacity technology reconstruction on UGS Dolní Dunajovice

RWE Gas Storage currently has no shutdowns or maintenance restrictions.

Planned shutdown: